公司名称:XXX
电话:XXX
手机:XXX
联系人:XXX
地址:XXX
Place the bottom sealing strip at the bottom of the bottom door plate and fix it from the back to the door plate with self-tapping nails of M4*16_or M6.4*16_. Place the chassis bracket on both sides of the door panel near the bottom sealing strip. Place 1 The roller is then coated with glycerin and inserted into the chassis bracket and 1 The 2 # fold, 3 # fold, 4 # fold and the top wheel bracket are fixed to the left and right position of the top of each door plate in sequence. The connection of the middlelajitong.71ix.combaozhuangdai.37ix.com.cntance.37ix.com.cnpenquan.37ix.com.cndiaosu.37ix.co
m.cnpaiwubeng.37ix.com.cn position of each door plate is 1 # fold. The door panels are placed in the established track in sequence, and the folded sheets and the door panels are connected with the self-tapping nails of M6.4 *16, so that the door panels are combined into one